| Sign In | Join Free | My burrillandco.com |
|
| Ask Lasest Price | |
| Brand Name : | VIBRA |
| Model Number : | FV-350 |
| Certification : | ISO 9001:2015 |
| Price : | Negotiation |
| Payment Terms : | T/T,D/P,L/C,Western Union,MoneyGram |
| Supply Ability : | 15 set/month |
| Delivery Time : | 15-35 days |
VIBRA Series Hydraulic Vibratory Pile Driver
Core Keywords: Pile Driver, Vibratory Pile Driver, Hydraulic Pile Driver, Excavator-Mounted Pile Driver, Foundation Piling Equipment
The VIBRA Hydraulic Vibratory Pile Driver utilizes high-frequency vibration to transfer mechanical energy to piles, causing soil liquefaction and reducing side friction. This enables efficient pile sinking and extraction using the excavator’s hydraulic system. Suitable for diverse soil conditions and pile types, it delivers quiet, high-speed, and non-destructive piling operations for construction, municipal, and infrastructure projects.
| Model | Vibration (RPM) | Centrifugal Force (kN) | Max Pile Length (m) | Excavator Weight (T) |
|---|---|---|---|---|
| FV-250 | 2500 | 265 | 10 | 20–30 |
| FV-280 | 2800 | 335 | 12 | 20–30 |
| FV-300 | 3200 | 350 | 12 | 30–35 |
| FV-330 | 3200 | 372 | 12 | 33–40 |
| FV-350S | 3200 | 435 | 15 | 35–40 |
| FV-350 | 3200 | 455 | 15 | 40–45 |
| FV-400 | 3200 | 485 | 18 | 45–60 |
Q: What is the warranty period?
A: The warranty is 12 months from installation, covering the main machine and key components (excluding wear parts).
Q: What is the MOQ?
A: Minimum order quantity is 1 set.
Q: What payment methods are accepted?
A: We accept T/T and D/P payments.
Q: What is the delivery time?
A: Delivery takes 7–35 days to Shanghai Port; overseas shipping time varies.
Q: Can I add my logo to the machine?
A: Yes, logo customization is available.
Q: How is product quality ensured?
A: All equipment follows national "Technical Conditions for Pile Driver Enterprises" standards.
Q: Can I become a dealer?
A: We welcome dealers and regional agents for long-term partnerships.
|